Illustrative photograph · Workshop InsiderCC BY-SA 4.0

SEAWORTHY DYNAMICS / SELECTED MARITIME WORK

The detail behind
every decision.

Complex marine engineering assignments require evidence that can withstand scrutiny, practical judgement under pressure and reporting that helps stakeholders move forward. Our selected case studies show how technical discipline is applied to real maritime challenges.

MARINE ENGINEERING · CASUALTY INVESTIGATION · CLAIMSINDEPENDENT TECHNICAL JUDGEMENT

THE WORK BEHIND THE RESULT

Engineering judgement.
Evidence with purpose.

Selected assignments show how engineering evidence informed repair, claim and technical decisions.

Case details are limited to protect confidentiality.

Clear conclusions are earned through rigorous technical work, not assumed from first impressions.

SELECTED EXPERIENCE / CASE STUDIES

The evidence in practice.

Selected assignments, with their scope and status clearly identified.

Project 01 · Marine Engineering

Status: Completed · Corrective Resolution Secured

Dual Fuel Engine Reliability & Warranty Recovery

Two LNG dual-fuel vessels. Recurring fuel-system failures. A manufacturer-funded corrective programme.

Repeated high-pressure fuel-pump failures continued despite earlier replacement efforts, while the original warranty had expired. The task was to establish the technical pattern, assess the underlying deficiencies and present a substantiated case for manufacturer responsibility.

We reviewed the failure and maintenance history, component performance and earlier corrective actions, then developed the findings into a technical claim and negotiated resolution. The agreed programme covered critical component replacements and wider fuel-system upgrades across both vessels.

Read Project 01 case study
01 INVESTIGATEFailure pattern & records
02 SUBSTANTIATETechnical claim & evidence
03 RESOLVEFunded corrective action

Project 02 · Hull & Machinery Claims

Status: Repairs completed · Dossier submitted to underwriters

Machinery Damage Investigation & Completed Repair

An evidence-led machinery damage investigation followed by coordinated repair and a completed technical dossier.

The investigation examined damage to an intermediate-shaft journal and white-metal bearing, together with related propulsion components, specialist inspection findings, dimensional measurements and repair records.

The completed repair cost approximately USD 156,000 against repair quotations of approximately USD 213,000. Reports, photographs, measurements and repair records were compiled into the technical dossier submitted to underwriters for compensation review. Submission of the dossier is not confirmation of insurance payment.

EXAMINEDamage, measurements and records
TESTPhysical findings against causation hypotheses
ASSESSRepairs, necessity and cost evidence
Read Project 02 case study

Project 03 · Marine Casualty Investigation

Status: Ongoing investigation

Collision, Grounding & Machinery Causation Review

An ongoing investigation into reported propulsion failure, vessel control and subsequent seabed contact.

The assignment concerns a collision followed by grounding and reported rudder and propeller damage. It includes an independent technical examination of the shipowner’s allegation that a main-engine malfunction caused loss of propulsion and control.

The work also considers casualty sequence, machinery and hull damage, and the technical basis and cost of proposed repairs for Hull & Machinery and P&I claim consideration. Causation conclusions remain pending.

Discuss a similar casualty or claim

OUR RESPONSIBILITY TO CLIENTS

Every detail matters.
Especially the difficult ones.

Discretion, technical independence and evidence integrity are not afterthoughts. They shape how we receive instructions, conduct investigations, manage sensitive information and report the findings.

01 / CONFIDENTIALITY

Respect the sensitive record.

Case studies are selectively presented. Detailed vessel information, commercial documentation and client instructions are handled in accordance with the obligations of each assignment.

02 / EVIDENCE

Separate facts from assumptions.

Physical findings, operational records and alternative explanations are assessed methodically, including evidence gaps and any limits of certainty.

03 / ACCOUNTABILITY

Make findings usable.

Technical conclusions are documented clearly to support repair decisions, claim consideration, negotiation and further expert review.

INDEPENDENT MARINE TECHNICAL SUPPORT

A complex case deserves
clear technical direction.

For machinery failure, casualty investigation, damage assessment or a demanding maritime project, tell us what you need to establish. We will discuss the appropriate scope, confidentiality and next practical step.